On site with On Target Drilling

On site in Millwater with On Target Drilling as they install a gas pipe using trench-less technology. Directional drilling one small hole where the drill enters the earth and another small hole at the other end where the drill exits the earth and pulls the pipe through. The drilling length is 220m long and 17m deep in certain places along the way. On Target Drilling used the imagery on their website as a case study and for marketing material.

Previous
Previous

Long Bay Village

Next
Next

Customcrete